Detecting your location…
18.1948° N, 120.5896° E · ILOCOS NORTEREAL-TIME YIELD: 5.2 kWh/m² · UV INDEX 7

Installation · Repair · PEC-Compliant Systems

Architect Your Energy Independence.

Reliable solar power for Filipino homes, farms, and businesses — sized to your actual needs, priced transparently, and built to last.

Even on cloudy or rainy days, Tier 1 modules capture diffused UV light — solar power is a predictable asset, not a fair-weather bet.

Cloud-Efficiency Filter: OFF

See how panels perform under overcast conditions

Roots in Northern Luzon · Deployed Nationwide

Modern residence with solar panels
25yr
Panel Warranty
≥50%
Bill Reduction

02 · How We Make Solar Work for You

Stop paying high electricity bills. Start keeping that money.

Whether you're running a household, a small farm, or a business — your electricity bill is one of the biggest monthly expenses you can actually control. We size every system to your real consumption so you see a genuine drop in your bill from the very first month. We strictly follow standard installation procedures and comply with the Philippine Electrical Code (PEC) to ensure maximum safety and performance.

Agri-Solar

Agri-Solar

Farms · Irrigation · Cold Storage

Cut fuel and electricity costs on your farm. Agrivoltaic systems protect crops while powering irrigation — deployed across Cagayan Valley, Benguet highlands, and Ilocos farmlands.

Most farms recover costs in 3–5 years
Residential

Residential

Homes · Condos · Subdivisions

Hybrid solar with LiFePO4 battery storage keeps your home powered even during brownouts. Sized to your actual usage — not a one-size-fits-all package.

Most homes recover costs in 4–6 years
Commercial

Commercial

Offices · Warehouses · Retail

Large-scale systems from 10kW to 50kW+. Net metering-ready and PEC-compliant — designed to slash your daytime electricity bill significantly.

Most businesses recover costs in 3–5 years

Grid-Tied Solar System

Connects directly to the utility grid. Excess generation is exported for net metering credit. No battery required — the most affordable way to start cutting your electricity bill.

Net Metering ReadyNo Battery RequiredMost Affordable Entry
Site Assessment
Load Analysis
System Design
Permitting
Installation
Commissioning
Net Metering Application

03 · Hardware Blueprint

Only Tier 1 and proven Tier 2 brands. No compromises.

Every component we install is sourced from manufacturers with proven field performance in Philippine climate conditions — high humidity, salt air, and typhoon-rated wind loads.

Solar Panels

High-efficiency monocrystalline modules for residential, commercial, and industrial installations

Tier 1 International — All Panels
LONGi Solar
Jinko Solar
JA Solar
Canadian Solar
Trina Solar

System Brain (Hybrid Inverters) & Energy Storage (LiFePO4 Lithium Batteries)

Brands are grouped by quality tier — the same tier classification used across all our solar packages

Premium Quality (Tier 1 International)
DeyeSolaX PowerGrowattPylontechDeye ESS
Balanced Value (Tier 2)
LuxpowerSRNEECG SolaXLvTopSunSolaX Battery
Budget-Friendly
ANERNSNADIPowMRAlltopElec

All brands listed are actively serviced and have local distributor support in the Philippines — ensuring spare parts availability and warranty claims are honored without overseas shipping delays.

For OFW Families

Protect your family's home while you're away.

You work hard abroad so your family can live well back home. But high electricity bills eat into the remittances you send every month. A solar system turns that recurring cost into a one-time investment — and your family keeps more of what you send.

Our team handles everything from assessment to commissioning. You don't need to be in the Philippines — we coordinate directly with your family, and you can monitor the system remotely once it's running.

  • Reduce the monthly bill your family pays

    Most homes cut their electricity bill by 40–70% from the very first month.

  • Brownout protection with battery backup

    LiFePO4 battery storage keeps lights and appliances running during power outages.

  • We coordinate with your family on-site

    You don't need to be present. We handle the full process and keep you updated.

  • 25-year panel warranty, 1-year workmanship

    Long-term peace of mind — your investment is protected for decades.

Example savings

₱5,000/month electricity bill → ₱1,500/month after solar

That's ₱3,500 saved every month — ₱42,000 a year — that stays in your family's pocket instead of going to the utility company.

₱42,000

saved per year

4–6 yrs

typical payback

25 yrs

panel warranty

Cash-basis payment — no bank loans required

60%

Down payment upon signing

Secures your slot and materials order

20%

Upon delivery of materials

Paid when components arrive on-site

20%

Upon completion

Paid after commissioning and sign-off

Payment via bank transfer, GCash, or cash. No financing, no installment plans.

Customized to fit your budget & needs

We believe safe renewable energy should be accessible to everyone.

From basic income earners to commercial enterprises — you tell us what you need and what you can comfortably afford, and we will build a safe, PEC-compliant solution that fits your wallet perfectly. No pressure, no upselling, no financing schemes.

View all packages & pricing

Your solar system can become a stream of income

Many of our smart provincial clients turn their installations into local community businesses — safely running extension lines to share excess daytime power with neighboring households or adjacent sari-sari stores for a clean monthly profit.

  • Generate income from excess daytime solar power
  • Help your neighbors access affordable electricity
  • Build community resilience against brownouts
  • All setups must comply with ERC guidelines — our certified installers can advise

Client Testimonials

Trusted by Filipino Homes, Farms & Businesses

Real results from real customers across Northern Luzon and beyond.

4.9/ 5 · 47 verified reviews
Residential
"Our monthly Benguet Electric Cooperative bill dropped from ₱8,400 to under ₱1,200 after P&A Solar installed our 8kW hybrid system. The team was professional, PEC-compliant, and finished in two days. Highly recommended."

Rodrigo M.

La Trinidad, Benguet

Commercial
"We run a small pension house and electricity was eating our margins. P&A Solar sized a 10kW commercial system perfectly for our load. Our bill dropped dramatically and the savings are already ahead of what they projected. Very satisfied."

Marites C.

Vigan City, Ilocos Sur

Agri-Solar
"I was skeptical about agri-solar but the P&A team explained everything clearly. Our irrigation pumps now run on solar and we've cut fuel costs significantly. The panels even provide partial shade for our vegetable beds."

Danilo F.

Bayombong, Nueva Vizcaya

Residential
"From the free savings assessment to final commissioning, the process was smooth and transparent. No hidden costs, no surprises. The 1-year workmanship warranty gives us real peace of mind."

Grace T.

Baguio City, Benguet

Residential
"P&A Solar installed a 5kW system for our family home. The Deye hybrid inverter and LiFePO4 battery keep us running even during brownouts. Excellent after-sales support — they responded within hours when I had a question."

Ernesto V.

Candon City, Ilocos Sur

Commercial
"Our rice mill now runs almost entirely on solar. P&A Solar handled the net metering application with our local utility and the whole process was hassle-free. Savings are real and consistent."

Lorna B.

Solano, Nueva Vizcaya

Join 47+ satisfied customers across the Philippines. Get your free savings assessment →

Share P&A Solar:

06 · Nationwide Deployment

Rooted in Northern Luzon. Deployed across the Philippines.

Our operations center in Benguet serves as the hub for nationwide project deployment. From Ilocos to Mindanao, our installation teams bring the same PEC-compliant standards to every site.

Active Deployment

Benguet
Ilocos Sur
Nueva Vizcaya
Cagayan Valley
Metro Manila
Visayas
Mindanao

MAIN OFFICE MANILA

Room 3F, Third Floor Alfred Building, #1191 Quirino Highway, Novaliches, Brgy. Kaligayahan, Quezon City, 1124 Metro Manila

MAIN OFFICE ILOCOS SUR

CANDON CITY PUBLIC MARKET — 2nd Flr., Public Market Bldg Candon City Ilocos Sur, At top of Greenwich Fastfood, 2710 Gaerlan St, Candon City, Ilocos Sur

MAIN OFFICE BENGUET

BUGUIAS BENGUET — 2nd Floor M. Balucas Building Abatan, Buguias, 2607 Benguet

MAIN OFFICE LA TRINIDAD BENGUET

JC-105 CENTRAL PICO, UNIT 310, 3RD FLR., KM 5, LA TRINIDAD, BENGUET

MAIN OFFICE NUEVA VIZCAYA

BAYOMBONG, Nueva Vizcaya

Free Savings Assessment

Get a personalized solar savings estimate for your property.

₱2,000₱500k+

Meralco · Acoje · Local cooperative bills all accepted.

Google Reviews

What Our Customers Say

Real results from Filipino homes, farms, and businesses powered by P&A Solar.

5.0
6 reviews

Rodrigo M.

"Our monthly Benguet Electric Cooperative bill dropped from ₱8,400 to under ₱1,200 after P&A Solar installed our 8kW hybrid system. The team was professional, PEC-compliant, and finished in two days. Highly recommended."

Posted on Google

Marites C.

"We run a small pension house and electricity was eating our margins. P&A Solar sized a 10kW commercial system perfectly for our load profile. ROI is tracking ahead of their projection. Very satisfied."

Posted on Google

Danilo F.

"As a rice farmer in Nueva Vizcaya, the agri-solar setup has been a game-changer. We power our irrigation pumps and sell excess to the grid. P&A Solar handled the net metering paperwork too."

Posted on Google

Lorna B.

"Five-star service from assessment to commissioning. The Candon City team explained every step clearly. Our 6kW system with LiFePO4 battery keeps us running even during brownouts."

Posted on Google

Engr. Rodel T.

"I checked their PEC compliance documentation before signing. Everything was in order — proper permits, licensed installers, correct wire sizing. Rare to find this level of professionalism in the solar industry."

Posted on Google

Ana Grace P.

"Our Quezon City townhouse now runs almost entirely on solar. The Manila office team was responsive and the installation was clean. Monthly savings of ₱5,200 — the system will pay for itself in under 5 years."

Posted on Google